Civil aviation easements: legal obligations, risks and legal practice

Civil aviation easements are often ignored in real estate practice, even though a missing AACR clearance can invalidate a building permit and trigger fines of up to RON 100,000 or even demolition of the structure. The article clarifies the legal obligations, the typology of easements, aviation protection zones and the practical risks for investors.

By Denis Jignea · 29 July 2025

Summary: Civil aviation easements are often ignored in real estate practice, even though the absence of AACR clearance can invalidate a building permit and attract severe sanctions. This article clarifies the legal obligations, the associated risks and how investors can avoid legal blockages.

Keywords: aviation easement, AACR, prior clearance, Air Code, real estate developments, zoning restrictions, demolition of a structure, annulment of a building permit, aviation protection zones

In the context of Romania's accelerated urbanisation, civil aviation easements (servituți aeronautice civile) are a distinct category of zoning restrictions and special regimes, often neglected — whether out of ignorance or out of lack of diligence — yet one that makes its presence felt ever more frequently in the practice of real estate developments. Although expressly provided for in the Air Code and in the technical regulations issued by the Romanian Civil Aeronautical Authority (AACR), they are often overlooked by developers, local authorities or even technical specialists.

Meanwhile, the absence of AACR clearance in zoning or building-authorisation procedures can entail the nullity of administrative acts, significant contravention fines and, ultimately, even the demolition of structures built without observing this special regime.

The applicable legal framework and its scope

The legal regime of civil aviation easements is regulated primarily by the Romanian Air Code (Legea nr. 21/2020), Order no. 735/2015 and Order no. 893/2020. In addition, Law no. 50/1991 expressly provides that, for buildings located in areas subject to special restrictions, a building permit cannot be issued without the clearance of the authority that instituted the restriction — in this case, the AACR.

In essence, any zoning intervention (PUG, PUZ, PUD), change of use or erection of structures in areas affected by civil aviation easements requires the prior obtainment of AACR clearance, even where this clearance is not expressly requested in the zoning certificate.

Legal obligations: between the authorities and project owners

Responsibility for obtaining AACR clearance is not ancillary, but a standalone obligation resting with the individual or legal entity that intends to erect or authorise a structure or to change the use of land situated in an area affected by aviation easements. The provisions of Order no. 735/2015 state expressly that the obligation falls on any person who owns, administers or uses land in such areas, or who carries out activities that may constitute obstacles to air navigation or may affect flight safety.

In parallel, aerodrome operators are obliged to determine the areas subject to easements, to submit them to the AACR for clearance and, subsequently, to notify the local public authorities, which are tasked with integrating these areas into the zoning documentation. Unfortunately, this obligation is often neglected, giving rise to a vicious circle in which the absence of the mentions in the zoning documentation is invoked by developers as an excuse.

Typology of easements and the affected zones

The aviation regulations classify easements into 4 major categories: clearance easements, marking (beacon) easements, radio-electric easements and other types of easements. Each of these corresponds to a particular type of risk to the safety of air navigation — whether through physical interference (vertical obstacles), electromagnetic interference or reflectivity, smoke sources, or the attraction of birds.

As regards the delimitation of the affected zones, Order no. 735/2015 provides for a division into four concentric zones, measured against the aerodrome runway elevation:

  • Zone I includes the area located at the ends of the runway, extending up to 15 kilometres; in this zone, any object with a height of at least 30 m above the aerodrome elevation requires AACR clearance;
  • Zone II covers a distance of up to 4,500 m from the edges of the runway strip; any object with a height of at least 30 m above the aerodrome elevation requires AACR clearance;
  • Zone III extends radially up to 8,500 m; any object with a height of at least 30 m above the aerodrome elevation requires AACR clearance;
  • Zone IV begins at the edge of Zone III and extends to the limit of controlled airspace; in this zone, the threshold is 45 m above the aerodrome elevation for obtaining AACR clearance.

In addition, structures located outside these zones, but with heights equal to or greater than 100 m above ground level, fall within the obligation of clearance by the AACR.

At the same time, the siting of any structure with a height of more than 45 m triggers the obligation to notify the AACR, even if it is not located in an expressly delimited zone.

Sanctions and legal consequences

The sanctioning regime under the applicable law is particularly rigorous. Depending on the nature of the subject, fines ranging between RON 8,000 and RON 100,000 may be applied. Aerodrome operators may be sanctioned for failing to fulfil their obligations to determine the areas subject to civil aviation easements, local authorities for the omission of integrating them into the zoning documentation, and individuals or legal entities that build without AACR clearance may bear both pecuniary sanctions and the extreme measure of demolition of the structure erected in the absence of AACR clearance.

More serious still is the fact that, pursuant to Law 50/1991, all acts issued in breach of the clearance regime — including the zoning certificate, the PUZ, the building permit or the completion acceptance report — are subject to absolute nullity. Since the nullity can be determined by the court of law, this risk is not a theoretical one, but a concrete one, already attested in judicial practice.

It is also important to note that AACR clearance is not subject to a tacit-approval regime. Aviation legislation expressly excludes this possibility: the missing clearance being equivalent to a refusal of clearance, even in the absence of an official response to that effect.

The possibility of coming into compliance

Order no. 735/2015 allows structures erected without AACR clearance to be brought into compliance, but only to the extent that, following a specialised technical analysis, it is found that the respective structure does not affect flight safety. The absence of such clearance unequivocally requires the demolition of the structure.

This solution is not an automatic one and must not be confused with a zoning-type regularisation: a simple request for analysis from the developer is not sufficient. The AACR will assess each case individually, taking into account, first and foremost, the location, height, positioning and the concrete impact on flight routes or airport infrastructure.

Practical aspects and case law

In the due diligence activity accompanying real estate transactions, the absence of AACR clearance is one of the most frequent omissions identified in the practice of recent years. Both at the PUZ stage and at the building-authorisation stage, this clearance is often ignored or omitted, either because it is not requested in the zoning certificate, or because it is erroneously considered that the project falls outside the scope of the aviation regulations.

The courts, however, have begun to sanction these omissions firmly, attributing direct responsibility to developers. Even if the local authority does not include AACR clearance on the list of clearances requested, this does not exonerate the investor. A lack of diligence in verifying the legal regime of the land and any aviation easements is unlikely to be accepted as a sufficient defence before a diligent judge. Consistently, the administrative litigation courts find that the investor is obliged to analyse the complete legal regime of the site, and the absence of an express mention of the clearance requirement in the zoning certificate does not remove the legal obligation to obtain AACR clearance.

Conclusions

In an increasingly complex zoning landscape, the regime of civil aviation easements can no longer be treated as a technical detail. Obtaining AACR clearance is an essential legal condition, disregard of which can lead to serious project blockages, major financial losses and costly litigation, including after many years of the structure's existence and even after its transfer between successive owners.

To avoid these risks, developers, technical consultants and specialised lawyers must include verification of the aviation regime in all the key stages of the project: due diligence, the preparation of zoning plans, the obtainment of the zoning certificate and the issuance of the building permit.

Only a rigorous and anticipatory approach can ensure legal compliance and the protection of the investment.